Gear Vender Unit Expand Snap Ring
|
After putting all the gears, clutch sleeves, stop rings, and bearings back in place, install the newly assembled longer tailshaft into the intermediate housing. If you already have a long-tailshaft tranny, you need not disassemble the output shaft. While installing the output shaft into the housing, with the new 308 bearing, expand the snap ring instead of contracting it as with the 307. View Related Article
|
|