0511 Tci Shift 11 Z
|
Our attention is now turned to our separator plate, which is modified by enlarging several of the drilled holes to increase fluid flow to certain areas of the valvebody. All of the required drill bits are supplied with the kit. Remember to follow the kit's instructions carefully and be sure to deburr any holes you drill with a file, deburring stone, or sandpaper so that the valvebody parts all mate properly. Clean the transfer plate and separator plate in solvent and dry prior to assembly. With the casting lying on the bench, the steel check balls are reinstalled. Our application had five quarter-inch balls, but the street/strip version of the kit dictated that we only reinstall four of the five. All models retain the 11/32-inch ball in its stock location. The instructions and diagram were clear and easy to follow. View Related Article
|
|
|
|